ZOVARAEnergy
Sunrise over the curve of the Earth, photographed from the International Space Station.

A long-term energy company

Energy for the long run.

Zovara Energy builds energy projects for the long term. The first, a used-oil re-refining plant in South Africa, is in development. The ambition runs a good deal further.

Everything ahead of us runs on energy.

Every advance we make draws down power. Making that power clean and steady enough to count on takes decades. Zovara was built for that kind of patience, and it starts with one plant.

USED OILRE-REFINEDIESEL

Zovara Energy is a South African long-term energy company. Its first plant re-refines used oil into diesel. It is the first of a series.

Based in

Johannesburg, South Africa

Founded by

Ledain Addleson and Kai Viljoen

Stage

Plant One in development, targeting 2027

Plant One

Our first plant is being developed in South Africa.

It re-refines used lubricating oil, a hazardous waste, into diesel to the national specification, and it is the first of a planned series.

Status: in development. Technology selected, feasibility complete. Development capital being raised. Site selection under way in Gauteng and KwaZulu-Natal. Updated September 2026.

Plant One, in seven lines.

Every plant in the series will be described with the same seven rows. When a row changes, the date changes with it.

Feedstock

Used lubricating oil, collected from registered generators with chain-of-custody documentation.

Process

The plant removes water, metals and contaminants, then separates the oil into fuel fractions. A modular unit, proven in operation elsewhere, sized to run continuously.

Product

Diesel, certified to the South African standard, SANS 342, before a litre is sold.

Designed capacity

In the order of 6.5 million litres of diesel a year at full capacity. A design figure, not yet demonstrated.

Buyers

Registered industrial buyers under contract, mining first. Never cash, never the informal market.

Site

South Africa. Selection under way in Gauteng and KwaZulu-Natal, close to feedstock and to the industry that buys the product.

First product

Targeted for 2027, subject to financing and permitting.

In development.

Stage, stated plainly, so that progress can be checked against it.

We have selected the technology, completed the feasibility study and defined the plant.

We have not yet secured a site, obtained authorisations or closed financing, and construction has not begun. The licences Plant One needs before it operates are listed at the foot of this page with their current status.

  1. TechnologySelected
  2. FeasibilityComplete
  3. Development capitalRaising now
  4. Site secured
  5. Authorisations
  6. Financial close
  7. First productTarget 2027

Proof before promise.

We develop and operate energy projects, and we are deliberate about where we begin.

Real assets

We build plants that run. Plant One is a modular unit, proven in operation elsewhere, inspected independently before acceptance. Each one has to earn its place before we build the next.

Sound economics

Every project is designed to pay for itself on fuel sales, to registered industrial buyers under contract. We have no interest in ventures that only work on subsidy.

Licensed, certified, then sold

Plant One operates only once its environmental authorisation, waste and emissions licences and fuel licences are in place, and its diesel is certified before it is sold.

Verified, not claimed

Every figure we stand behind can be checked by someone other than us. Where a number is a design figure or an estimate, we say so.

We measure progress in decades.

OneA single plant proves the model. It is in development now.
ManyA series turns that proof into infrastructure, one plant at a time.
StableInfrastructure turns supply into something you can count on for the long term.

Plants two onward are at concept stage. A second South African plant follows once the first is operating; no sites are secured and no capital is committed to them.

Zovara is built to last as long as the world needs clean, dependable energy.

A serious company, built for a long mission.

Zovara Energy is a South African energy company based in Johannesburg. We build real projects and the discipline to run them well, starting small and growing with intent.

How the company is governed

Zovara operates from Johannesburg. The board is the two founders. An independent director and an audit function are planned at financial close.

Leadership

Ledain Addleson

Founder & Chief Executive Officer

Sets Zovara's strategy and leads its growth. Founder and operator for more than thirty years, most recently of Clearsky Energy and Clearsky Aviation, active in aviation fuel and diesel distribution. Zovara follows three years of developing the concept.

Kai Viljoen

Chief Operating Officer & Chief Technology Officer

Leads Zovara's operations and technology, from strategic partnerships to infrastructure and risk.

Further leadership and advisory profiles are shared with investors and partners on request.

The detail lives behind this door.

What we publish here is what any serious party can check. How the business makes money and how the plant gets built is shared directly with qualified investors and partners, under confidentiality.

  1. 01

    Register interest

    Tell us who you represent and in what capacity. Two minutes, no documents.

  2. 02

    Investor brief

    A non-confidential summary, by email, within one business day.

  3. 03

    Confidentiality

    Accept the standard NDA at the data-room entrance, or execute your own.

  4. 04

    Data room

    Corporate, licences with status, technical, model, offtake, legal. Per person, watermarked, logged.

  5. 05

    Meetings and site

    With the founders, at your request.

Or write to ledain@zovara.energy.

Intended for professional and institutional investors. This page is not an offer to the public.

Tell us who you are